
6-2 Installing power supplies
Overview
Standard 1.0 Modular Option EC Installation and Maintenance Guide November 1999
Overview
Introduction
This chapter provides the steps you need to install the common
equipment power supplies in each module of either an AC
(CEPS) or a DC (DCEPS) system.
Interpret references to modules MM0, MM1, and MM2 as
follows:
• The module that contains Meridian Mail node 1 is module
MM0.
• The other module in any 2-module system is module MM1.
• In a 5-node shadowed system, the other module that
contains 2 nodes (besides module MM0) is module MM1.
• The last module in a 5-node shadowed system is module
MM2.
This Meridian Mail module numbering applies regardless of the
placement of modules within a column.
Comentarios a estos manuales