
Adding a node 14-29
Three- to four-node expansion (shadowed)
Standard 1.0 Modular Option EC Installation and Maintenance Guide November 1999
f. After the hexadecimal display on each non-prime node's
Enhanced MMP40 board reaches .6, the testing
successfully completes. Power off all modules and proceed
with the software expansion (step 8).
g. If the hexadecimal display on any Enhanced MMP40 board
does not increment to .6, then power off the module, replace
that board, and try again (return to step 7 e).
8 Refer to the “Comprehensive upgrade” chapter in the
System
Installation and Modification Guide
(NTP 555-7001-215) for
further instructions on how to complete the expansion.
9 Configure the switch for the TNs that correspond to the added
ports. See Chapter 12, “Configuring the Meridian 1,” for details.
Step Action
Comentarios a estos manuales