Seagate ST3390N Guía de instalación Pagina 242

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 468
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 241
14-12 Adding a node
Three- to four-node expansion (unshadowed)
Standard 1.0 Modular Option EC Installation and Maintenance Guide November 1999
Three- to four-node expansion (unshadowed)
Introduction
Determine where the expansion module should be placed,
according to the Meridian Mail Modular Option EC Site and
Installation Planning Guide (NTP 555-7061-200).
Expanding from a 3- to
a 4-node unshadowed
system
To expand from a 3- to a 4-node unshadowed system, follow
these steps.
Step Action
1 Power down the system.
Note:
You must properly courtesy down the system before you
can power down. For more information on courtesy down
procedures, refer to the “System status and maintenance
chapter in the
System Administration Guide
appropriate to your
site.
2 Install the new module. Refer to
the section on “Adding a
module to a column” in
SL-1 System Installation Procedures
(NTP 553-3001-210).
3 Insert the CEPS, Enhanced MMP40 board (module MM1, slot
6), and disk drive (module MM1, slot MSU2) into node 4 as
indicated in “Adding node 4 to an unshadowed system” on
page 14-13.
Note:
Before you install the disk unit, verify its jumper settings.
Refer to Chapter 7, “Installing the disk drives and tape drive.”
Note:
Insert new hardware for expansion in slots as indicated
by the shaded areas ( ) in all the figures within this
chapter.
Vista de pagina 241
1 2 ... 237 238 239 240 241 242 243 244 245 246 247 ... 467 468

Comentarios a estos manuales

Sin comentarios