Seagate ST3390N Guía de instalación Pagina 227

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 468
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 226
Starting up and configuring Meridian Mail 13-7
Starting up Meridian Mail
Standard 1.0 Modular Option EC Installation and Maintenance Guide November 1999
10 Check the system status to make sure the channels are
functional and all links are up.
Press the [System Status] softkey.
Node status should be InService for all nodes, and DSP port
status should be Idle for all voice ports. Prior to reaching the
InService state, the node status and port status go through a
Loading state while the software is being loaded. See the
illustration below for an example of the System Status screen.
Note:
For a full description of this screen, see the
System
Administration Guide
(NTP 555-7001-301).
If you power up the system without the network loops
connected, the diagnostics run and the software loads, but the
channels time out and fail, and error messages appear.
11 If the total number of ports for each node is incorrect, refer to
the “Modify hardware” chapter in
System Administration Tools
(NTP 555-7001-305).
12 If everything appears to be in order, press [Exit] to return to the
Logon screen.
Step Action
System Status
Select a softkey >
Exit
System Status: InService Alarm Status: Critical = Off Major = Off Minor = On
Link Status: 1-7-2: InService
DSP Port Status Storage Used
Node Type Status Active Idle OutSv Faulty Pending Others Voice Text
1 MSP InService 1% 4%
2 SPN InService 0 16 0 0 0 0 1% 4%
3 SPN InService 0 16 0 0 0 0 1% 4%
4 SPN InService 0 16 0 0 0 0 1% 4%
5 SPN InService 0 16 0 0 0 0 1% 4%
Last Event: 41-97 VoiceBase Loading on Node 1 4/19 16:31
g101074
Vista de pagina 226
1 2 ... 222 223 224 225 226 227 228 229 230 231 232 ... 467 468

Comentarios a estos manuales

Sin comentarios