Seagate ST3390N Guía de instalación Pagina 119

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 468
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 118
Installing intramodule and intermodule cabling 9-13
Intermodule bus cable connection
Standard 1.0 Modular Option EC Installation and Maintenance Guide November 1999
To install EVB cabling for two modules and two utility cards,
follow these steps.
Intermodule cabling for a two-module system
Step Action
1 If there is an EVB terminator in positions 1 and 0 of shroud S7
of module MM1, remove it, label it as EVB terminator, and store
it safely.
2 Connect one end of an EVB cable from position 1 on shroud S7
of module MM0 to position 1 on shroud S7 of module MM1.
3 Connect one end of an EVB cable from position 0 on shroud S7
of module MM0 to position 0 on shroud S7 of module MM1.
Module
MM0
Module
MM1
Rear view of modules
B. Two utility cards (modules MM0, MM1)A. One utility card (module MM0 only)
Meridian Mail 2-module system
Terminator
External voice bus cabling
S7 S5
1
0
I/O
I/O
S7 S5
1
0
0
I/O
1
I/O
Module
MM0
Module
MM1
Rear view of modules
S7 S5
1
0
0
I/O
1
I/O
S7 S5
1
0
0
I/O
1
I/O
G100081
Vista de pagina 118
1 2 ... 114 115 116 117 118 119 120 121 122 123 124 ... 467 468

Comentarios a estos manuales

Sin comentarios