
Adding a node 14-23
Two- to three-node expansion (shadowed)
Standard 1.0 Modular Option EC Installation and Maintenance Guide November 1999
Two- to three-node expansion (shadowed)
Introduction
Determine where the expansion module should be placed,
according to Meridian Mail Modular Option EC Site and
Installation Planning (NTP 555-7061-200).
Expanding from a
2-node to a 3-node
shadowed system
To expand from a 2- to a 3-node shadowed system, follow these
steps.
Step Action
1 Configure the switch for the TNs that correspond to the added
ports. See Chapter 12, “Configuring the Meridian 1,” for details.
Note:
You must properly courtesy down the system before you
can power down. For more information on courtesy down
procedures, refer to the “System status and maintenance”
chapter in the
System Administration Guide
appropriate to your
site.
2 Install the new module. Refer to the section on “Adding a
module to a column” in
SL-1 System Installation Procedures
(NTP 553-3001-210).
3 Insert the CEPS, Enhanced MMP40 board (module MM1,
slot 6), and disk drives (module MM1, slots MSU2 and
MSU3) into node 3 (Node X/Y) as indicated in
“Adding node 3 to a shadowed system” on page 14-24.
Note:
Before you install the disk units, verify their jumper
settings. Refer to Chapter 7, “Installing the disk drives and tape
drive.”
4 If you need extra RS-232 ports, install a utility card (module
MM1, slot 5).
5 Install the EVB cables as shown in “Intermodule cabling for a
two-module system” on page 14-25. If you did not install a utility
card, install an EVB terminator on shroud S7 in module MM1.
See Chapter 9, “Installing intramodule and intermodule
cabling,” for details.
Comentarios a estos manuales