Seagate ST43401N/ND Información técnica Pagina 153

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 172
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 152
Migrating to Sybase Adaptive Server Enterprise 11.5 D-9
Adaptive Server Enterprise 11.5 Parallel Migration Task List Example
Define Test/Acceptance Criteria—Regression Test Suites
Back-end regression test suite—production loads
1. Identify back-end queries.
2. Encapsulate back-end queries.
3. Create back-end test suite (
showplan, stat io, and stat time wrappers).
Front-end simulation regression test suite
1. Identify target user functions.
2. Capture and map SQL for target user functions.
3. Encapsulate SQL for user functions.
4. Create front-end simulated test suite (
showplan, stat io, and stat time
wrappers)
Front-end Phase 1 and 2 regression test suite
1. Identify front-end test scenarios.
2. Review front-end application and acceptance/test procedures.
3. Document functional test approach.
4. Compose front-end test mix matrix.
Set Up Target Production Environment
1. Identify physical drive configuration for Server A (production)
and Server B (shadow).
2. Configure physical drives.
3. Perform a dump of the production environment.
4. Install SQL Server 10.x on Server B.
5. Configure SQL Server 10.x on Server B, to duplicate Server A.
6. Update the interfaces.
7. Create the databases.
8. Load the Server A dump on Server B.
9. Run
dbcc commands (checktable, checkalloc, checkcatalog).
Vista de pagina 152
1 2 ... 148 149 150 151 152 153 154 155 156 157 158 ... 171 172

Comentarios a estos manuales

Sin comentarios